At Nortech Systems, our goal is to become involved in the early stages of product development and provide design for manufacturability, test and supply chain analysis. This early intervention reduces design efforts and ultimately reduces manufacturing and testing costs. Early involvement cements customer relationships. The result is a partnership-based relationship rather than a supplier-based relationship. 
Nortech Systems has developed a documented, validated process for the transition of products from design to manufacturing called Device MAP™. This process was designed to be adaptable to each customer’s specific needs and can be engaged at any state of the product life cycle. Device MAP™ is the bridge between the developer and the manufacturer. Its key benefits include:
- Speeds Time to Market
- Decreases Development Costs
- Reduces New Product Introduction Time
- Lowers Product Cost
- Improves Quality
- Insures Regulatory Compliance
With DeviceMAPTM the product and the manufacturing process are developed concurrently. Manufacturing, process and procurement engineers are engaged as soon as possible to identify methods, techniques and processes that are cost effective and meet design inputs.
Our Supply Chain experts develop the supply chain strategy early in the product development stage and bring supplier engineering resources to bear insuring cost effective supply solutions.



